Wentprop Storage

Industrial

Colorado Springs, Colorado

Brief Summary

Crossland Construction built a three-story climate-controlled storage facility for Woodmen Storage, LLC, in Colorado Springs.

This 125,000 SF facility featured 876 individual storage units that are fully climate controlled and a 60’x 60’ interior loading bay with three overhead doors of various sizes. The facility also contained an office and display areas to showcase storage units to potential customers. Unique materials included the light gauge load-bearing structural framing package and “Janus” package for storage unit panels and coiling doors.

The project was completed in the mid-winter months, which resulted in 42 weather days for this project. However, our teams pushed on through the schedule to keep the project moving forward, with the framers in place and ready to go on the heels of the masonry work. Woodmen Storage, LLC now has a well-performing asset in a thriving location.

Project facts

  • SIZE - 125,000 SQUARE FEET
  • CONTRACT VALUE - $10.4 MILLION
  • DELIVERY METHOD - HARD BID
  • CLIENT - WOODMEN STORAGE, LLC
  • ARCHITECT - ANDREWS DESIGN FIRM

Project Photos

HOW CAN WE HELP YOU?

Get in touch

or Call (620) 429-1414

Real People. Real Purpose. Real Builders.