Pittsburg State University, in collaboration with Crossland Construction, replaced and upgraded numerous features of the Pitt State football and track and field stadium.  New turf was installed, with fresh end-zone designs and new goal posts.  The track and long jump lanes were upgraded for safety purposes, and new track curbing was installed.  Steeplechases and pit covers were also added to the track lanes.  Electrical and data lines were upgraded as well.  Crossland built the original PSU $9 million skybox/stadium additions and installed the new Jumbotron screen and scoreboard.

Project facts

  • Client – Pittsburg State University
  • Size – 80,000 square feet
  • Cost - $0.6 million
  • Delivery Method – Design/Build
  • Crossland self-performed concrete and demolition