Crossland Heavy Contractors was awarded a subcontract to APAC-Central as part of the $7.6 million Highway 264 Interchange Improvement project. Crossland Heavy’s scope of work included phased demolition and construction/rehabilitation of the I-49 overpass bridge on State Highway 264 in Lowell, Arkansas. The bridge construction consisted of a 4 Span – 264 foot continuous composite W beam bridge unit with concrete deck. In addition to the bridge work, Crossland Heavy Contractor crews constructed two separate box culvert extensions.