Edison Preparatory College Counseling Center

Educational

Tulsa, Oklahoma

Brief Summary

Crossland Construction Company was awarded the contract for the $5.3 million addition to the Edison Preparatory School College Counseling Center.  At 18,000 square feet, the facility’s most notable feature is the 7,400 square foot FEMA tornado shelter.  The shelter area serves as two large lecture classrooms with sloped seating.  It is constructed of concrete walls that are 12 inches thick, with a concrete ceiling that is six inches thick.  The second floor of the structure is home to classrooms, a computer lab, offices, and a conference room.  The exterior façade is primarily glass curtain walls and large porcelain tiles that match the color of the existing, adjoining brick structure.

Project facts

  • Client — Tulsa Public Schools
  • Size — 18,000 square feet
  • Cost — $5.3 million
  • Delivery Method — Construction Management At Risk

Project Photos

HOW CAN WE HELP YOU?

Get in touch

or Call (620) 429-1414

Real People. Real Purpose.

Real Builders.