Cotton County, OK previously maintained a multiple-well system to provide water to their residents, which made managing the chemical levels in their drinking water a complicated task. To make their water treatment process simpler and more efficient, Cotton County hired Crossland Heavy Contractors to build a new water treatment plant.

The project included multiple components: a pre-engineered metal building, two lagoons, two new wells, seven steel tanks, four miles of distribution piping, a chemical feed system, a pump station, and an all-encompassing operations building that houses a lab, filtration system, chemical feed system, electrical controls, and storage. The pump station connects and combines eight separate well sources and distribution systems into one unified system that can all be controlled remotely, enabling the owner to maintain and service the station without cutting off supply to any part of the community.


The new process building, combined with the two new wells, will virtually double the water capacity of Cotton County. This is the first plant in Oklahoma to use this type of treatment and filtration process. Due to equipment procurement lead times, Crossland Heavy crews had to erect the metal building before installing the tanks inside. This was a challenging process that required much coordination and precision to pass six interior filter, blending, and waste tanks through an overhead door using multiple pieces of equipment. Additionally, all building piping had to be installed before installing the filtration media, creating a significant obstruction to area access. Collaboration among teams helped us to complete the project on time and within budget and to help Cotton County more efficiently deliver quality drinking water to its residents.

Project facts

  • CONTRACT VALUE - $5.2 MILLION
  • OWNER - Cotton County RWD No. 2
  • ARCHITECT/ENGINEER - Jung Engineering
  • SELF-PERFORMANCE - Yard + Process Piping, Cast-in-Place, Concrete Structural Steel
  • CROSSLAND HEAVY DIVISION - OKC
  • DELIVERY METHOD - DESIGN/BID/BUILD, HARD BID