Clinton Raw Water Pump Station Improvements

Pump Stations

Lawrence, Kansas

Brief Summary

The Clinton Raw Water Pump Station Improvements project had a Design-Bid-Build contract value of $1.5 million.  Completed in 2016, the scope included construction/installation of a new electrical room to house three new adjustable frequency drives, one, relocated adjustable frequency drive, one switchboard, one automatic transfer switch, one programmable logic controller cabinet, and several other miscellaneous devices.  Crews also replaced one five million gallon/day pump with a new 10 million gallon/day pump, along with associated piping and appurtenances.  Additionally, we replaced approximately 280 linear feet of the 36 inch raw water transmission main, as well as the pump station roofing and security fencing, and electrical transformations.  Finally, Crossland performed miscellaneous demolition and electrical work, and some site work.

Project facts

  • CONTRACT VALUE - $1,559,395
  • DELIVERY METHOD - DESIGN BUILD
  • CLIENT - CITY OF LAWRENCE
  • ENGINEER - BLACK AND VEATCH

Project Photos

HOW CAN WE HELP YOU?

Get in touch

or Call (620) 429-1414

Real People. Real Purpose. Real Builders.