Bentonville Bikeway Designs
Implementing a new technology to enhance biker safety
Bentonville, AR
This project was the City of Bentonville’s pilot project to trial a new technology to enhance biker safety on their many popular biking routes. Phase 1 of the project included the construction of concrete shared use path and included the addition of directional separated bikes lanes on NW 3rd Street and a two-way separated bike lane on the north side of NW 3rd Street. Phase 2 included the addition of a two-way separated bike lane on the south side of SW 8th Street. It also incorporated the extension of a shared use path on SW 8th Street to connect to the existing Applegate Trail.
This project has repurposed the existing streets to reduce vehicle traffic and increase bike traffic by constructing an on-street bikeway with a high-tech bike buffer that contains both horizontal and vertical elements to protect the bikers who are so essential to the Northwest Arkansas Community. Crossland Heavy is proud to be part of this project which has been so successful that the City plans to implement the same process and technology on their other bike routes.
Project Facts
Industry Sector: Transportation
Cost: $1,596,231
Delivery Method: Design-Bid-Build / Hard Bid
Self-Perform: Below-Grade Utilities, Cast-in-Place Concrete
Owner: City of Bentonville
Engineer: Toole Design
Let’s Build
Ready to lay the groundwork?
Find a Career
We’ve got a hard hat with your name on it.