
Aspen Iron Horse 2
Building Opportunity: Wichita Expands Industrial Space at Ironhorse Park
Wichita, KS
The second of two large industrial buildings further expands opportunities at Wichita’s Ironhorse Manufacturing Park.
Owned by Aspen Funds, this growing industrial park offers versatile space for manufacturing, warehousing, distribution, and more. This $8.9 million project delivered the park’s second spec building, featuring 130,000+ SF available for leasing.
The facility was constructed using painted tilt-up walls with color-matched caulking and integrated storefront systems. For tilt-wall construction, Super Lynk Tilt Wall Connections were utilized, and subcontractors employed glue-down form brackets when pouring the tilt walls.
Interior finishes include bare concrete, a fire pump room, and a storefront entry. Given the owner’s remote location, clear communication was essential. We provided frequent photo updates to ensure the owner could track progress and collaborated to reduce costs on select items without compromising the warranty.
During pre-construction, we optimized the lighting package to accommodate future tenant racking layouts, reducing upfront costs. Additionally, we adjusted the roof system from a 1/2″ cover board to a 1/4″ cover board and transitioned from a fully adhered TPO system to a mechanically fastened TPO roof system, providing both savings and efficiency.
A particular challenge was managing the steep slope on the south side of the building. To address potential runoff and long-term maintenance concerns, we poured concrete on the slope, providing a durable and effective solution.
Crossland values our strong partnership with the project architect, Tessere, Inc., and we look forward to collaborating on many future projects.
Project Facts
Size: 131,168 SF
Delivery Method: Design-Build
Owner: Aspen Sunflower Industrial I, LLC
Architect: Tessere, Inc
Let’s Build
Ready to lay the groundwork?
Find a Career
We’ve got a hard hat with your name on it.