Arcadia Lake WTP Residuals Handling and Imp
Edmond, OK
The City of Edmond Water Treatment Plant began the process for a large expansion in 2018, and they are still continuing their expansion today. Crossland Heavy Contractors took on the first phase of the expansion: the Sludge Handling Facility. The existing plant had no sludge handling equipment; they utilized drying beds to dry and store all their lime before transporting it off site. Our $39.5M project allows the City to dry the solids within hours for immediate hauling offsite, instead of weeks or months.
We constructed 8 new facilities for the plant: a Dewatering Facility, Solids Handling Pad, Thickened Sludge Pump Station, 2 Gravity Thickeners, Lime Storage Area, Sedimentation Basin, and a Detention Pond. This equipment- heavy project included Thickener Mechanisms, Progressive Cavity Pumps, Belt Filter Presses, Conveyor Systems, Geothermal Well Fields, and a Polymer Blending System. Our scope also included rehabilitation to the existing facilities including Filter Media replacement, check valve replacement, flow meter replacement, fencing and gate replacement, and providing new point- to-point communication towers across the city to reconstruct their aging network.
Project Facts
Industry Sector: Water Treatment Plant
Cost: $38,174,538
Delivery Method: Design-Bid-Build / Hard Bid
Self-Perform: Earthwork, Yard + Process Piping, Earthwork + Excavations, Cast-in-Place Concrete, Process Equipment Installation
Owner: Edmond Public Works Authority
Engineer: Carollo Engineers, Inc.
Project Awards:
ABC of Oklahoma Excellence in Construction
Let’s Build
Ready to lay the groundwork?
Find a Career
We’ve got a hard hat with your name on it.
Latest News
Looking for More?
Crossland Construction: Climbing the Ranks of the Industry’s Leading Contractors in ENR’s Top Lists
Building Up the Community: Crossland Cares in Action
A Full Circle Moment: Crossland Pittsburg State University Celebrate a Monumental Partnership