Turkey Creek Pump Station Improvements
Mission, KS
The Turkey Creek Pump Station Improvements project consisted of renovations to four major areas. At the Dry Weather Pump Station we replaced the building’s roof, two mechanical bar screens and washer compactors, influent channel slide gates, and valves on the pump discharge lines. We also improved the safety of the facility by constructing a cast-in-place stair structure for access to the below-grade structure, replacing all handrail, and installing a structural walkway for better access to piping and valves. At the Dry Weather Electrical Building we replaced the dry weather pump VFD’s, the HVAC system, and the roofing. At the Wet Weather Pump Station we replaced the submersible pumps, installed new piping, manual bar screen, sodium hypochlorite storage tank and feed pump skid, and constructed a new electrical room and a new roof. At the Peak Excess Flow Treatment Facility (PEFTF), we replaced all the PEFTF equipment and performed other various structural and instrumentation/electrical modifications and upgrades. All of these essential improvements will benefit the pump station for years to come.
Project Facts
Industry Sector: Pump + Lift Station
Cost: $5,133,073
Delivery Method: Design-Bid-Build / Hard Bid
Self-Perform: Below-Grade Utilities, Yard + Process Piping, Cast-in-Place Concrete, Process Equipment Installation
Owner: Johnson County Wastewater
Engineer: HDR
Project Awards:
ABC Heart of America Excellence in Construction
Let’s Build
Ready to lay the groundwork?
Find a Career
We’ve got a hard hat with your name on it.